Asset
Asset Type
Asset Maturity
Current Stage
Data Completeness
Indicative Recovery Potential
Last Saved
West Africa FPSO
Diagnose | 72% | $168.0M
Diagnose Stage
Identify Root Causes & Systemic Contributors
Identify bad actors, root-cause hypotheses, systemic contributors, and evidence required to validate the recovery case.

Root-cause and contributor logic
The diagnostic stage connects recurring symptoms to root causes, contributors, bad actors, and system-level issues that explain why value is being lost.
- Likely root cause
- Equipment reliability / bad actors
- Top systemic gap
- Spares and materials constraints
- Evidence required
- Trip, CMMS, spares, operating envelope
Selected Leakage Categories (5)
Data Completeness
72%
Evidence Quality
68%
Confidence Score
Medium 72%
Critical Bad Actors
14
Systemic Gaps
9
Diagnostic Progress
Value-at-Risk, Risk Matrix & Register
AGA® combines financial exposure, the 5x5 likelihood/severity matrix, and a governed risk register before recovery prioritization.
Pre
20 High
Post
4 Low-Med
Value
$216.0M / yr
Value at Risk (indicative)
Financial exposure linked to the risk register and recovery controls.
$216.0M
/ year
5x5 Risk Matrix
Severity x likelihood from the attached risk tracker template.
AGA® Risk Register
Fix-first register links
AGA® methodology
Risk is quantified before prioritization, linking loss history to severity, likelihood, controls, residual exposure, and fix-first sequencing.
ASTOR Knowledge OS
Owns the canonical AGA® 5x5 matrix scale, risk-register schema, control taxonomy, residual-risk labels, and approved evidence metadata.
ASTOR Intelligence Platform
Generates risk matrix views, gap registers, executive summaries, and PDF / PowerPoint outputs from validated AGA® evidence.
19-Domain AGA® Spider Net
Questionnaire-derived maturity view across strategy, reliability, integrity, execution, data, and governance.
Responders
42
Anonymized
Questions
155
Evidence set
Coverage
86%
Response rate
Domains
19
Questions
155
Avg. maturity
2.8 / 5
ISO reference
4.2
Questionnaire signal
The spider net converts anonymized questionnaire responses into a 19-domain maturity profile, then compares current evidence against the ISO 55000 target band.
Lowest maturity domains
Domain index
Maturity Pyramid vs ISO 55000
Compares the AGA® evidence-adjusted maturity result against ISO 55000-style asset management discipline, using the report-derived five-level maturity model.
Current
2.8
56%
ISO ref.
4.2
84%
Gap
1.4
Priority uplift
Level 5 · Operational Excellence
Comprehensive asset management approach
ISO 4.2Level 4 · Reliability Culture
Lifecycle reliability, control and standardization
Level 3 · Organizational Excellence
Multidisciplinary maintenance and operations integration
AGA 2.8Level 2 · Proactive Maintenance
Equipment control, RCA discipline and recurrence prevention
Level 1 · Planned Maintenance
Basic process foundation and maintenance work control
ISO 55000 Heatmap & Color Code
Heatmap ranges translate weighted questionnaire scores into evidence maturity bands.
System Detractors of Losses
Converts selected symptoms into system-level value leakage contributors.
$82.0M
$61.0M
$28.0M
$24.0M
$21.0M
Pareto of Recoverable Losses
Shows where leadership attention concentrates the fastest recovery effect.
Next Recommended Action
Identify Root Causes & Systemic Contributors
Identify bad actors, root-cause hypotheses, systemic contributors, and evidence required to validate the recovery case.
Root-cause focus
Compressor train reliability, critical spares readiness, PM compliance, and deferment coding.
Evidence package
Trip register, operating envelope, maintenance history, backlog age, and stockout lead times.
Leadership decision
Approve a focused AGA® review to confirm what to fix first and what recovery is worth.
Executive Summary Preview
Wider leadership-ready summary generated from the selected leakage profile, quantified value, and recovery path.
Asset Challenge Overview
West Africa FPSO is being screened through ASTOR AGA® for Recurring compressor trips, high deferred production, maintenance backlog, and critical spares delays impacting uptime and reliability.
Hidden Value Leakage Profile
Recurring Trips & Shutdowns, Deferred Production, Flaring & Gas Losses, Maintenance Backlog, Spares & Readiness Gaps.
AGA® Stage Completion Summary
72% indicative data completeness; results remain subject to validation with site data.
